Projects /

BLADE, 44m

50 / 26

Project: 44-metres semi displacement motor yacht, MMGI 2010.

Executed works: operational, technical, financial management of the vessel, crew management.

Full-scale yacht refit: installation of gyroscopic stabilizers and elevator; replacement of air conditioning system, navigation and hydraulic system. Design and layout of new interior for guest and crew quarters and bridge. Structural modification of the stern, gunwales, and guardrail; installation of a new mast; complete repainting of the hull and superstructure. The work was carried out at the Monaco Marine (La Ciotat) shipyard and involved the following subcontractors: MGM, Sinnex, Vripack, Bonsink, T3, Mikela Reverberi, Cramm and Lift Emotions.

Period: 2010-2011

Press releases

BLADE, 44m
BLADE, 44m
BLADE, 44m
BLADE, 44m
BLADE, 44m
BLADE, 44m
BLADE, 44m
BLADE, 44m
BLADE, 44m
BLADE, 44m
BLADE, 44m
BLADE, 44m
BLADE, 44m
BLADE, 44m
BLADE, 44m
BLADE, 44m